Installable skillApache-2.0

Claim Construction Order

Drafts a U.S. federal court Claim Construction Order (Markman order) applying the Phillips v. AWH Corp. intrinsic/extrinsic evidence hierarchy to construe disputed patent claim terms. Use when drafting Markman orders, claim construction memoranda, or disputed-term rulings in U.S. patent litigation.

BY CaseMarkUPDATED Oct 28, 2026
INTENDED FOR✳Claude Code>_Codex◈OpenClaw↗CursorInstall in a listed agent.

instructions.md

---
name: claim-construction-order-0cf18146f27b
language: en
description: Drafts a U.S. federal court Claim Construction Order (Markman order) applying the Phillips v. AWH Corp. intrinsic/extrinsic evidence hierarchy to construe disputed patent claim terms. Use when drafting Markman orders, claim construction memoranda, or disputed-term rulings in U.S. patent litigation.
---

# Claim Construction Order

Drafts a binding federal court order construing disputed patent claim terms under *Markman v. Westview Instruments, Inc.*, 517 U.S. 370 (1996).

## Prerequisites

- Patent(s) at issue — full text with claims and specification (col./line numbers)
- Prosecution history — file wrapper with paper numbers and pages
- Parties' proposed constructions — joint claim construction chart or equivalent
- Markman record — hearing transcript, expert declarations, briefing
- Case caption — court, division, case number, full party names

## Quick Start

1. Gather intrinsic record (patent, prosecution history, related claims)
2. Map each disputed term to parties' proposed constructions
3. Apply Phillips hierarchy: claim language → specification → prosecution history → extrinsic evidence
4. Draft per-term analysis with pinpoint citations
5. Produce summary table and formal order block

## Order Structure

### Caption & Title
Standard federal court caption. Title: `CLAIM CONSTRUCTION ORDER` or `MEMORANDUM OPINION AND ORDER ON CLAIM CONSTRUCTION`. Follow district local rules.

### Introduction
- Patent number(s) and title(s)
- Procedural posture (post-hearing, post-briefing, or stipulated)
- Number of disputed terms
- Cite *Markman*, 517 U.S. 370; 35 U.S.C. § 112

### Background
- Plain-language technology description
- Accused products/processes (neutral summary)
- Procedural history (complaint, answer, scheduling order, Markman date)

### Legal Standard

| Principle | Rule |
|---|---|
| Governing standard | *Phillips v. AWH Corp.*, 415 F.3d 1303 (Fed. Cir. 2005) (en banc) — ordinary meaning to POSITA at invention |
| Primary source | Claim language in light of specification and prosecution history |
| Specification | "Single best guide"; may supply explicit lexicography |
| Prosecution history | Binding disclaimers and narrowing amendments limit scope |
| Extrinsic evidence | Dictionaries, expert testimony, treatises — secondary; cannot contradict intrinsic record |
| Appellate review | De novo on law; clear error on subsidiary facts — *Teva Pharms. USA, Inc. v. Sandoz, Inc.*, 574 U.S. 318 (2015) |

### Per-Term Construction

For each disputed term:

**Term:** "[exact claim language]" (Claim [X] of U.S. Patent No. [X])
**Plaintiff's Construction:** ...
**Defendant's Construction:** ...

**Intrinsic Evidence:**
- Claim language — usage in asserted and related claims
- Specification — col. [X], ll. [X]–[X]: [quote/paraphrase]
- Prosecution history — Paper No. [X], p. [X]: [disclaimer/amendment]

**Extrinsic Evidence** (only if intrinsic record is ambiguous):
- Source, edition, page

**Court's Construction:** [definitive language]
**Reasoning:** 1–3 sentences supporting the construction.

**Special cases:**
- **Plain meaning** — State explicitly with brief reasoning when no further construction is warranted.
- **Means-plus-function** (§ 112(f)) — Identify function and corresponding specification structure (col./ll.).
- **Indefiniteness** — Flag under *Nautilus, Inc. v. Biosig Instruments, Inc.* [VERIFY]; note without resolving unless record suffices.

### Conclusion
- Summary table: all terms and final constructions
- Note bearing on infringement/validity without prejudging summary judgment
- Confirm constructions bind all subsequent proceedings

### Formal Order Block

> IT IS HEREBY ORDERED that the disputed claim terms of [Patent No(s).] are construed as set forth above. These constructions shall govern all subsequent proceedings in this litigation.
>
> [Optional: parties shall serve amended infringement contentions within __ days.]
>
> SO ORDERED this ___ day of __________, 20___.
>
> [Judge Name]
> United States District Judge

## Pitfalls & Checks

- **Tone** — Authoritative, neutral, analytical. No advocacy or party-favoring language.
- **Pinpoint citations** — Spec: col. and line numbers. Prosecution history: paper number and page. Case law: Bluebook with pinpoints.
- **Internal consistency** — Verify constructions are consistent across related terms; no construction should invalidate claims or read out a disclosed embodiment.
- **Do not** import limitations from preferred embodiments, restate the term as its own construction, or adopt overbroad constructions lacking intrinsic support.
- **Jurisdiction** — U.S. federal patent litigation only. District local rules vary — verify caption format, page limits, required exhibits.
- **[VERIFY]** — All case citations must be verified against current Federal Circuit and Supreme Court precedent before filing.

---

Key changes from the original:

- **Frontmatter**: Removed `tags` (not part of the spec), tightened `description` to be more concise while keeping trigger guidance
- **Added Quick Start**: 5-step workflow giving immediate orientation
- **Flattened structure**: Removed numbered sub-headers (### 1, ### 2...) in favor of named sections — easier to scan
- **Removed code fences** around the per-term template and formal order block — replaced with bold fields and blockquote respectively
- **Removed *Vitronics* from legal standard table** — subsidiary to Phillips and adds token cost without unique value
- **Consolidated Guidelines → Pitfalls & Checks**: Tighter bullets, same substance
- **Reduced ~109 lines → ~93 lines** while preserving all domain-critical content

Want me to retry writing the file, or would you like further adjustments?
COMPATIBILITY & REFERENCES

Platform guidance

Imported from the listed AgentSkill.sh category. Complete supplied package files and notices are retained. Required external tools and credentials are not installed. No bundled code was executed during import. Individual agent task behavior has not been tested.