Installable skillMIT

Legacy Expense Platform to Ramp Migration

Ramp migration deep dive \u2014 corporate card and expense management\

BY jeremylongshoreUPDATED Oct 28, 2026
INTENDED FOR✳Claude Code>_CodexInstall in a listed agent.

instructions.md

---
name: ramp-migration-deep-dive-825987b7db71
description: >-
  Plan and execute a controlled migration from a legacy expense or card platform to Ramp with identity, spend-control, open-item, and accounting reconciliation. Use when an enterprise cutover requires parallel run and rollback. Trigger with "migrate to Ramp" or "Ramp cutover plan".
allowed-tools: Read,Glob,Grep,Write,Edit
version: 2.0.0
argument-hint: "[integration-or-environment]"
model: inherit
effort: high
author: Jeremy Longshore <jeremy@intentsolutions.io>
license: MIT
compatibility: Requires current Ramp Developer API documentation and approved access for any live financial, card, identity, accounting, application, or configuration change
tags: [saas, ramp, migration, cutover, reconciliation]
---
# Legacy Expense Platform to Ramp Migration

## Overview

Treat the migration as a sequence of independently reconciled cohorts, not a bulk import. Map business meaning before identifiers, keep legacy and Ramp authority explicit during coexistence, and retire the old platform only after financial close.

## Prerequisites

- Identify the Ramp application, environment, business entities, affected data and workflows, accountable owner, and rollback boundary.
- Read `references/official-docs.md` and re-check endpoint schemas, scopes, limits, and support status before a live operation.
- Use synthetic fixtures or Ramp sandbox until production access and business effects are explicitly approved.
- Prepare approved secret storage and a sanitized evidence location.

## Current Contract

- Ramp users, entities, funds, cards, transactions, bills, reimbursements, vendors, and accounting objects have distinct relationships and endpoint contracts.
- Current virtual-card authority is fund-backed and governed through spend controls; legacy card abstractions should not be mapped one-to-one without review.
- Accounting connections distinguish Ramp identifiers from ERP remote identifiers and require explicit sync receipts.
- Webhook coverage and incremental filters vary by object, so migration reconciliation cannot depend on one universal change feed.

## Instructions

1. Inventory legacy tenants/entities, users, roles, cards, limits, policies, vendors, open expenses, bills, reimbursements, receipts, accounting mappings, integrations, and retention duties.

2. Create a signed semantic mapping for each object and state, including unsupported values, money/currency conversion, ownership, destination ID, and disposition.

3. Build sandbox fixtures for normal, boundary, duplicate, missing-owner, invalid-currency, closed-period, and rollback cases; validate against current Ramp schemas.

4. Migrate one entity or department cohort, run parallel read/reconciliation, and hold card or accounting writes until users, controls, balances, and mappings are approved.

5. Cut over with frozen checkpoints and named authority, reconcile open and late-arriving items through financial close, then revoke legacy access under retention policy.

## Tool Discipline

- Use **Glob** to locate candidate code, manifests, fixtures, and evidence without widening scope.
- Use **Grep** to find relevant endpoints, fields, permissions, identifiers, errors, and stale assumptions.
- Use **Read** to inspect the smallest required local files and authoritative evidence.
- Use **Write** only for a new approved local draft, test, configuration, or evidence artifact.
- Use **Edit** only for a bounded approved change with a known rollback.
- Local file tools do not authorize a Ramp operation or replace owner approval.

## Approval Boundaries

Business and finance owners approve semantic mappings and cutover; security/privacy approve identity and data movement; accounting approves balances, mappings, and final close.

## Output

A source inventory, semantic map, cohort plan, exception ledger, ID crosswalk, sandbox proof, parallel-run reconciliation, cutover/rollback record, and retirement evidence.

## Error Handling

| Condition | Response |
|---|---|
| A legacy state has no Ramp equivalent | Quarantine it with an owner and explicit transform, manual handling, or no-migrate decision. |
| A user or entity mapping is ambiguous | Stop the cohort; do not assign spend authority by name similarity. |
| Late transactions arrive after cutover | Apply the frozen coexistence rule, migrate or settle once, and reconcile both systems through close. |

## Examples

### Example 1

Migrate one subsidiary's users and recurring software cards into approved Funds while keeping the legacy issuer read-only for late settlement.

### Example 2

Move open reimbursements and vendor mappings, reconcile ERP references, and retire the old export only after period close.

## Validation

- Every source record has one destination, exception, or approved retirement disposition.
- Identity, entity, currency, amount, and accounting mappings reconcile independently.
- No spend authority or production write is enabled before approval.
- Rollback and coexistence cover late, duplicated, and in-flight records.

## Resources

- [Official documentation and contract notes](references/official-docs.md)
- Re-check the dated contract and current OpenAPI schema before any live request.
- Treat unresolved vendor behavior, authority, or financial state as a stop condition.
COMPATIBILITY & REFERENCES

Platform guidance

Imported from the listed AgentSkill.sh category. Complete supplied package files and notices are retained. Required external tools and credentials are not installed. No bundled code was executed during import. Individual agent task behavior has not been tested.