RemoFirst rate limits \u2014 global HR, EOR, and payroll platform integration.\n\
BY jeremylongshoreUPDATED Oct 28, 2026
INTENDED FOR✳Claude Code>_CodexInstall in a listed agent.
instructions.md
---
name: remofirst-rate-limits-97cf802bedd4
description: >-
Build RemoFirst operational deadlines and supported connector sync cadence
without inventing API quotas. Use when payroll, timesheet, invoice, Workday,
or ADP timing affects a workflow. Trigger with "RemoFirst cutoff", "RemoFirst
sync timing", or "RemoFirst rate limits".
allowed-tools: Read,Glob,Grep,Write,Edit
argument-hint: "<workflow> <period-or-connector>"
version: 2.0.0
license: MIT
author: Jeremy Longshore <jeremy@intentsolutions.io>
tags: [saas, remofirst, deadlines, payroll, connectors]
model: inherit
effort: high
compatibility: Designed for Claude Code; live RemoFirst access requires an approved client account and explicit operator action
---
# RemoFirst Deadlines and Sync Cadence
## Overview
Build a timing plan from the documented business cutoffs and supported
connector behavior. No reviewed public source publishes a general RemoFirst API
quota, so this skill must not manufacture request-per-minute limits, retry
headers, endpoints, or backoff rules.
## Prerequisites
- Workflow, population, period, country, owners, and timezone.
- The live RemoFirst calendar or connector status available to an authorized user.
- A support owner for ambiguities or missed deadlines.
## Current Contract
- Monthly payroll has documented revision, review, approval, and funding stages;
live dates and worker-specific schedules remain authoritative.
- Contractor timesheet approval locks a submitted timesheet; rejection returns it
for correction.
- Workday sync is manually initiated and imports only supported approved records.
- ADP setup uses a short-lived account ID during connector authorization.
- No public first-party general API quota or SDK retry contract was found.
## Instructions
1. Classify the timing domain: payroll, contractor timesheet, invoice funding,
Workday sync, ADP activation, or a provider-issued private integration.
2. Record every time in one canonical timezone plus the operator's local time.
Include source URL, retrieval date, owner, and whether it is a guide or live date.
3. For payroll, confirm revision, approval, funding, and pay-date milestones from
the live period. Do not silently reuse dates from a prior month.
4. For timesheets, leave review time before approval because approval locks the
record. Reject incorrect entries early enough for contractor correction.
5. For Workday, schedule a human-triggered sync, review imported records, and
reconcile unsupported or edited data manually.
6. For ADP, generate the account ID only when the connector owner is ready to use
it; if it expires, repeat the documented setup instead of reusing it.
7. If a private interface is involved, use only its customer-specific written
quota and retry contract. Otherwise escalate rather than guessing.
## Tool Discipline
Use Read, Glob, and Grep on approved schedules and redacted reconciliation
artifacts. Use Write/Edit only for timing plans and evidence summaries. Do not
run sync, approve time/payroll, generate credentials, or fund invoices.
## Approval Boundaries
Payroll approval, timesheet approval/rejection, connector sync, account-ID
generation, invoice payment, and any retry against a private interface require
the designated human operator or explicit authority.
## Output
Return workflow, timezone-normalized milestones, source and retrieval date,
owners, safety margin, lock or expiry behavior, reconciliation step, blockers,
and escalation path. State explicitly when no public API quota applies.
## Error Handling
- Missing live date: block the plan and ask the payroll or provider owner.
- Missed cutoff: document impact and obtain a revised provider-confirmed date.
- Sync mismatch: stop repeat syncs until mapping and record state are reconciled.
- Unknown quota: do not probe; request the private contract from RemoFirst.
## Examples
- A payroll plan labels published day ranges as guidance and records live dates.
- An expired ADP account ID is regenerated by its authorized connector owner.
- "Use exponential backoff" is rejected without a private API contract.
## Validation
- Every milestone has timezone, owner, evidence, and current-period confirmation.
- Locking, expiration, and manual-sync behavior are represented accurately.
- No invented request limit, endpoint, retry code, or API credential appears.
## Resources
See [references/official-docs.md](references/official-docs.md) for the reviewed
payroll, timesheet, Workday, ADP, invoice, and support sources.
---
name: remofirst-rate-limits-97cf802bedd4
description: >-
Build RemoFirst operational deadlines and supported connector sync cadence
without inventing API quotas. Use when payroll, timesheet, invoice, Workday,
or ADP timing affects a workflow. Trigger with "RemoFirst cutoff", "RemoFirst
sync timing", or "RemoFirst rate limits".
allowed-tools: Read,Glob,Grep,Write,Edit
argument-hint: "<workflow> <period-or-connector>"
version: 2.0.0
license: MIT
author: Jeremy Longshore <jeremy@intentsolutions.io>
tags: [saas, remofirst, deadlines, payroll, connectors]
model: inherit
effort: high
compatibility: Designed for Claude Code; live RemoFirst access requires an approved client account and explicit operator action
---
# RemoFirst Deadlines and Sync Cadence
## Overview
Build a timing plan from the documented business cutoffs and supported
connector behavior. No reviewed public source publishes a general RemoFirst API
quota, so this skill must not manufacture request-per-minute limits, retry
headers, endpoints, or backoff rules.
## Prerequisites
- Workflow, population, period, country, owners, and timezone.
- The live RemoFirst calendar or connector status available to an authorized user.
- A support owner for ambiguities or missed deadlines.
## Current Contract
- Monthly payroll has documented revision, review, approval, and funding stages;
live dates and worker-specific schedules remain authoritative.
- Contractor timesheet approval locks a submitted timesheet; rejection returns it
for correction.
- Workday sync is manually initiated and imports only supported approved records.
- ADP setup uses a short-lived account ID during connector authorization.
- No public first-party general API quota or SDK retry contract was found.
## Instructions
1. Classify the timing domain: payroll, contractor timesheet, invoice funding,
Workday sync, ADP activation, or a provider-issued private integration.
2. Record every time in one canonical timezone plus the operator's local time.
Include source URL, retrieval date, owner, and whether it is a guide or live date.
3. For payroll, confirm revision, approval, funding, and pay-date milestones from
the live period. Do not silently reuse dates from a prior month.
4. For timesheets, leave review time before approval because approval locks the
record. Reject incorrect entries early enough for contractor correction.
5. For Workday, schedule a human-triggered sync, review imported records, and
reconcile unsupported or edited data manually.
6. For ADP, generate the account ID only when the connector owner is ready to use
it; if it expires, repeat the documented setup instead of reusing it.
7. If a private interface is involved, use only its customer-specific written
quota and retry contract. Otherwise escalate rather than guessing.
## Tool Discipline
Use Read, Glob, and Grep on approved schedules and redacted reconciliation
artifacts. Use Write/Edit only for timing plans and evidence summaries. Do not
run sync, approve time/payroll, generate credentials, or fund invoices.
## Approval Boundaries
Payroll approval, timesheet approval/rejection, connector sync, account-ID
generation, invoice payment, and any retry against a private interface require
the designated human operator or explicit authority.
## Output
Return workflow, timezone-normalized milestones, source and retrieval date,
owners, safety margin, lock or expiry behavior, reconciliation step, blockers,
and escalation path. State explicitly when no public API quota applies.
## Error Handling
- Missing live date: block the plan and ask the payroll or provider owner.
- Missed cutoff: document impact and obtain a revised provider-confirmed date.
- Sync mismatch: stop repeat syncs until mapping and record state are reconciled.
- Unknown quota: do not probe; request the private contract from RemoFirst.
## Examples
- A payroll plan labels published day ranges as guidance and records live dates.
- An expired ADP account ID is regenerated by its authorized connector owner.
- "Use exponential backoff" is rejected without a private API contract.
## Validation
- Every milestone has timezone, owner, evidence, and current-period confirmation.
- Locking, expiration, and manual-sync behavior are represented accurately.
- No invented request limit, endpoint, retry code, or API credential appears.
## Resources
See [references/official-docs.md](references/official-docs.md) for the reviewed
payroll, timesheet, Workday, ADP, invoice, and support sources.
COMPATIBILITY & REFERENCES
Platform guidance
Imported from the listed AgentSkill.sh category. Complete supplied package files and notices are retained. Required external tools and credentials are not installed. No bundled code was executed during import. Individual agent task behavior has not been tested.
Help users make better hiring decisions. Use when someone is evaluating job candidates, making hiring decisions, conducting reference checks, reviewing work samples or take-homes, calibrating their hiring bar, or deciding between finalists.
Help users navigate career changes and pivots. Use when someone is considering a new role, transitioning into product management, evaluating job offers, taking a sabbatical, or feeling stuck in their current position.
Help users build relationships with mentors and sponsors for career growth. Use when someone is looking for career guidance, wants to find a mentor, needs an advocate at work, is trying to build their professional network, or asking how to get advice from senior leaders.