# Agile Sprint Planning

## Table of Contents

- [Overview](#overview)
- [When to Use](#when-to-use)
- [Quick Start](#quick-start)
- [Reference Guides](#reference-guides)
- [Best Practices](#best-practices)

## Overview

Agile sprint planning provides a structured approach to organize work into time-boxed iterations, enabling teams to deliver value incrementally while maintaining flexibility and responding to change.

## When to Use

- Starting a new sprint cycle
- Defining sprint goals and objectives
- Estimating user stories and tasks
- Managing sprint backlog prioritization
- Handling mid-sprint changes or scope adjustments
- Preparing sprint reviews and retrospectives
- Training team members on Agile practices

## Quick Start

Minimal working example:

```markdown
# Sprint Planning Checklist

## 1-2 Days Before Planning Meeting

- [ ] Groom product backlog (ensure top items are detailed)
- [ ] Update user story acceptance criteria
- [ ] Identify dependencies and blockers
- [ ] Prepare estimates from previous sprints
- [ ] Review team velocity (average story points per sprint)
- [ ] Identify team availability/absences
- [ ] Prepare sprint goals draft

## Information to Gather

- Product Owner priorities
- Team capacity (working hours available)
- Previous sprint metrics
- Upcoming holidays or interruptions
- Technical debt items to address
```

## Reference Guides

Detailed implementations in the `references/` directory:

| Guide | Contents |
|---|---|
| [Sprint Planning Meeting Structure](references/sprint-planning-meeting-structure.md) | Sprint Planning Meeting Structure |
| [Story Point Estimation](references/story-point-estimation.md) | Story Point Estimation |
| [Sprint Goal Definition](references/sprint-goal-definition.md) | Sprint Goal Definition |
| [Daily Standup Management](references/daily-standup-management.md) | Daily Standup Management |

## Best Practices

### ✅ DO

- Base capacity on actual team velocity from past sprints
- Include buffer time for interruptions and support work
- Focus sprint goal on business value, not technical tasks
- Timeboxe planning meeting (2 hours max for 2-week sprint)
- Include entire team in planning discussion
- Break down large stories into smaller, manageable pieces
- Track story points for velocity trending
- Review and adjust estimates based on actual completion
- Maintain consistent sprint length
- Include retrospective improvements in planning

### ❌ DON'T

- Plan for 100% capacity utilization
- Skip story grooming before planning meeting
- Add stories after sprint starts (unless emergency)
- Let one person estimate for entire team
- Use story points as employee performance metrics
- Ignore team velocity trends
- Plan without clear sprint goal
- Force stories into sprints to match capacity numbers
- Skip sprint planning to save time
- Use planning poker results as final estimate without discussion


---
Source attribution: aj-geddes
Original project: https://github.com/aj-geddes/useful-ai-prompts/blob/3f5182cfd739fc113f4af5244a1cf342ad7f7911/skills/agile-sprint-planning/SKILL.md
License: MIT
License information: https://opensource.org/license/mit
Original upstream instructions; downloaded from Dave AI.

## Upstream license notice

MIT License

Copyright (c) 2025 AJ Geddes

Permission is hereby granted, free of charge, to any person obtaining a copy
of this software and associated documentation files (the "Software"), to deal
in the Software without restriction, including without limitation the rights
to use, copy, modify, merge, publish, distribute, sublicense, and/or sell
copies of the Software, and to permit persons to whom the Software is
furnished to do so, subject to the following conditions:

The above copyright notice and this permission notice shall be included in all
copies or substantial portions of the Software.

THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR
IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY,
FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE
AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER
LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM,
OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE
SOFTWARE.


# Dave AI resource metadata

Creator / publisher: aj-geddes
Original project: https://github.com/aj-geddes/useful-ai-prompts/blob/3f5182cfd739fc113f4af5244a1cf342ad7f7911/skills/agile-sprint-planning/SKILL.md
Attribution basis: Source repository record

Fields of work: Operations, Product Management, Project & Program Management
Roles: Business Process Analyst, Operations Manager, Product Manager, Project Manager, Scrum Master
Specialties: Cross Platform
Tools: Tool not specified
Country applicability: Country not specified
Classification basis: Source catalog labels
Instruction SHA-256: 7562a10691326c6eefae056a1c33db1f0e19946c38e46d11607d1e80fa7bad59